top of page
Featured Projects
SPL Trailblazer
0GA Wire on deck | Build Out 1 | MESA Mat On Ceiling | MESA Mat On Floor | Alternator Bracket | 3 Alternators Installed | Batt and Fuse Blocks Installed |
---|---|---|---|---|---|---|
Close Up Fuse Blocks | Front Distribution | Digital Design 15 Subs | Ported Sub box Fabrication | Sub Box Installed | Box Bracing | Box Stained |
15in Subs Installed | Sub Box Close Out Build | Wires Ran | Rear Batteries | Rear Batteries 2 | Rear Fuse Blocks | Rear Wires |
Amp Rack | Rear Speaker Installed | Rear Tweeter Installed | Door Build 1 | Door Build 2 | Door Build 3 | Front Door Build |
Front Door Build 2 | Front Door Lights | Door Panel Installed | Sub Box LEDs | DD Ported Sub Box | Amp Rack LEDs |
bottom of page